Feedback
I.D.: 6522173

Diverse lucrari (conform descrierii)

Data publicarii
27.05.15 Exista 415 licitatii active asemanatoare. Inregistrati-va pentru a avea acces la acestea.
Coduri CPV
51000000 31000000 32200000 32400000 32500000 32550000 35000000 35100000 45000000 71000000
Locul realizarii:
  • Descarca
  • Tipareste
  • Observatii
    Adaugati favorite, invitatii si note. Aceste functii sunt disponibile doar pentru utilizatorii logati in platforma. Logati-va sau inregistrati-va la o Testare Gratuita pentru a avea acces.
  • Trimite
Descriere:
The tunnel upgrade project Northern region is part of a national project that includes the upgrade of all national road tunnels in accordance with the ‘Regulations on minimum safety requirements for certain road tunnels’ (Tunnel Safety Regulations).The current national road tunnels in the Northern region have different standards due to varied construction practices over time. There will, therefore, be different measures in ...
The tunnel upgrade project Northern region is part of a national project that includes the upgrade of all national road tunnels in accordance with the ‘Regulations on minimum safety requirements for certain road tunnels’ (Tunnel Safety Regulations).The current national road tunnels in the Northern region have different standards due to varied construction practices over time. There will, therefore, be different measures in the various tunnels, based on their condition and construction date. The tunnels in this project are spread over the entire Northern region, but the majority are in the northern parts of Nordland. During project implementation focus will be on trying to achieve a uniform standard in the tunnels to the greatest possible extent, in relation to the requirements society has regarding safety and regularity.The works in this contract includes the following tunnels on the stretch Nord-Trøndelag border — Fauske:— Korgfjell tunnel, 8 533 m;— Finneidfjord tunnel, 857 m;— Nesset tunnel, 578 m;— Illhøllia, 1 260 m;— Saksenvik tunnel, 1,148 m;— Kvænflåget tunnel, 1 747 m;— Pytjehåjen tunnel, 110 m;— Breivikhammar tunnel, 186 m;— Nordmark tunnel, 184 m;— Dalmovikhals tunnel, 164 m;— Saltnes tunnel, 466 m;— Setsåhøgda tunnel, 180 m.The contract has a negative option for the following tunnels:— Pytjehåjen tunnel;— Breivikhammar tunnel;— Nordmark tunnel;— Dalmovikhals tunnel;— Saltnes tunnel;— Setsåhøgda tunnel.The tunnels with a negative option have separate financing than the other tunnels, and can be withdrawn from the contract if there is a lack of financing.The turnkey contractor is, in cooperation with the builder, to undertake the engineering design services for the works, and, based on the engineering design services, agree a target price with a structure as stated in the tender documents.The main amounts of the contract work are expected to be electrotechnical installations, as well as site engineering work resulting from, or a prerequisite for, electrotechnical installations.
Inregistrati-va acum pentru un test gratuit de 7 zile
si veti putea vizualiza aceasta licitatie si multe altele asemanatoare!
 

De ce licitatie-publica.ro?

  • Oportunitati de afaceri selectionate
    individual

  • Anunturi scanate si actualizate
    din peste 3200 surse publice si private

  • Manager de cont personal - chiar si
    in timpul testarii gratuite

  • Transmiterea zilnica a anunturilor noi

Contul meu