Feedback
I.D.: 91136134

Biogas facility - turnkey contract - technology and contract work - Rå Biopark

Data publicarii
22.12.23 Exista 20.348 licitatii active asemanatoare. Inregistrati-va pentru a avea acces la acestea.
Coduri CPV
45255800 09000000 09100000 09110000 09120000 42000000 42514000 42520000 44622000 45000000 45100000 45200000 45210000 45220000 45222100 45223000 45250000 45252000 45255000 45300000 45350000 45351000 45400000 51500000 51810000 51900000 71320000 71323200 71800000 76100000 90000000 90510000 90513000
Locul realizarii:
  • Descarca
  • Tipareste
  • Observatii
    Adaugati favorite, invitatii si note. Aceste functii sunt disponibile doar pentru utilizatorii logati in platforma. Logati-va sau inregistrati-va la o Testare Gratuita pentru a avea acces.
  • Trimite
Descriere:
Rå Biopark shall build a biogas plant. The plant and construction site are in Storfjord municipality, in Skibotn, approximately two hours' drive from the city of Tromsø. The supplier that is awarded this contract has a complete and overall responsibility to deliver a complete and well-functioning biogas plant according to the requirements specification and contract terms in this competition. This responsib...
Rå Biopark shall build a biogas plant. The plant and construction site are in Storfjord municipality, in Skibotn, approximately two hours' drive from the city of Tromsø. The supplier that is awarded this contract has a complete and overall responsibility to deliver a complete and well-functioning biogas plant according to the requirements specification and contract terms in this competition. This responsibility includes processes, machinery, equipment, technical support systems, technology and construction works necessary to produce liquid biogas as described in the specification. The supplier is responsible for delivering everything needed to make the biogas plant work. This includes, but is not limited to, the entire process from planning and engineering to construction and follow-up during the defect notification/complaint period. The Supplier is responsible for all engineering, materials, machinery and equipment needed to fulfil the Client's needs for a functioning biogas plant that meets all agreed requirements. The Supplier is also responsible for providing infrastructure at the construction site and building elements such as electricity and technical systems, pipes, water and sewage, control systems, odour management systems, fire alarm systems, etc. The supplier has full responsibility for the interface between all parts of the biogas plant that are relevant to the contract, including the building and construction work (the construction part). The Supplier shall be responsible for testing the plant, and follow-up during the complaint period, as well as training the Client's personnel to operate the plant. The supplier is encouraged to familiarise itself with the entire requirements specification (Appendix A) even if not all parts (lots/systems) apply to this EPC contract.The requirements specification is largely function-based, so it is up to the Supplier to find good solutions that fulfil the Client's described requirements and needs. The contract is based on the Norwegian standard contract NS 8407, which applies as general contractual provisions, with special provisions in addition.
Inregistrati-va acum pentru un test gratuit de 7 zile
si veti putea vizualiza aceasta licitatie si multe altele asemanatoare!
 

De ce licitatie-publica.ro?

  • Oportunitati de afaceri selectionate
    individual

  • Anunturi scanate si actualizate
    din peste 3200 surse publice si private

  • Manager de cont personal - chiar si
    in timpul testarii gratuite

  • Transmiterea zilnica a anunturilor noi

Contul meu